Product
Current location:Home>news
Daily maintenance of your veterinary anesthesia machine


Prerequisite : Oxygen supply : 40 to 60 psi (2.8 to 4.2 bar), patient circuit and bag.
Note: Repeat the following maintenance procedure for your 2 circuits (Bain & absorber).

Step 1
Connect the circuit to be verified to the fresh gas outlet of the veterinary anesthesia machine.

Step 2
Close the patient’s circuit outlet with a plug or your thumb.

Step 3
Open the flowmeter to approximately 200 ml.

Step 4
Close the gas evacuation valve.

Step 5
Depress the oxygen flush button and hold until the pressure on the manometer indicates approximately 30 cm H2O.

Step 6
Check the manometer. The pressure must not drop (But it can increase). If the pressure drops, replace the patient circuit and the bag and try again.

Step 7
Open the evacuation valve before using the veterinary anesthesia machine again.

If you encounter an excessive leak, it is recommended that you proceed by elimination to find the source of the problem by replacing a single component at a time. The most frequent leaks can be found at the fresh gas outlet o’ring, the patient circuit and the bag.

Once the leak identified, dispose of the defective item to avoid it being reused by error.

At the end of each day, it is recommended that you close the oxygen tank and fill up the anesthetic agent vaporizer.




2016.2.25

Last Article:Fault endoscope optical components
Next article:The advantages of animal dental X-ray machine